Flooring Installation Punch List

Project Information
Project Name Date
Location Installer
Completed By Flooring Type
Items to Check
Item Status Comments
Subfloor cleaned and prepared
Moisture levels checked
Materials delivered and inspected
Underlayment installed (if required)
Expansion gaps provided
Flooring installed correctly and evenly
Transitions and thresholds installed
Baseboards or trim reinstalled
Surface cleaned after installation
All debris removed from site
Notes Signatures
Name Signature Date