| Project Name | Date | ||
|---|---|---|---|
| Location | Installer | ||
| Completed By | Flooring Type |
| Item | Status | Comments |
|---|---|---|
| Subfloor cleaned and prepared | ||
| Moisture levels checked | ||
| Materials delivered and inspected | ||
| Underlayment installed (if required) | ||
| Expansion gaps provided | ||
| Flooring installed correctly and evenly | ||
| Transitions and thresholds installed | ||
| Baseboards or trim reinstalled | ||
| Surface cleaned after installation | ||
| All debris removed from site |
| Name | Signature | Date |
|---|---|---|