Concrete Pour Inspection Checklist

Project Name:
Location:
Date:
Inspector Name:
Contractor:
Weather Conditions:
Pour Start Time:
Pour End Time:
Pre-Pour Checks
Item Yes No N/A Remarks
Reinforcement in place and inspected
Formwork clean and secured
Embedded items installed
Dimensions and elevations checked
Site access and safety measures in place
Concrete Delivery
Item Yes No N/A Remarks
Approved supplier and concrete mix
Delivery tickets checked and recorded
Slump test performed
Temperature of concrete checked
During Pour
Item Yes No N/A Remarks
Continuous mixing and placement
Compaction/vibration undertaken
Level and surface finish maintained
Expansion/construction joints located
Post-Pour Checks
Item Yes No N/A Remarks
Surface finish checked
Curing method applied immediately
Protective barriers in place
Samples taken for testing
Additional Comments:
Inspector Signature:
Date: