HVAC System Installation Quality Checklist
Project Information
| Project Name |
|
Date |
|
| Location |
|
Installer |
|
| System Model |
|
Serial Number |
|
1. Equipment Inspection
| Check |
Yes |
No |
N/A |
Comments |
| All components and materials on-site and in good condition |
|
|
|
|
| Equipment model and capacity match specifications |
|
|
|
|
| Unit installed level and securely anchored |
|
|
|
|
2. Ductwork and Air Distribution
| Check |
Yes |
No |
N/A |
Comments |
| Ducts properly insulated and sealed |
|
|
|
|
| Air registers and returns installed in correct locations |
|
|
|
|
| System airflow checked and balanced |
|
|
|
|
3. Refrigerant and Drainage
| Check |
Yes |
No |
N/A |
Comments |
| Refrigerant lines properly sized and insulated |
|
|
|
|
| Leak test completed and passed |
|
|
|
|
| Condensate drain installed and tested |
|
|
|
|
4. Electrical and Controls
| Check |
Yes |
No |
N/A |
Comments |
| Wiring and disconnects installed per code |
|
|
|
|
| Thermostat installed and operational |
|
|
|
|
| System startup tested successfully |
|
|
|
|
5. Final Inspection and Sign-off
| Check |
Yes |
No |
N/A |
Comments |
| System operates across all modes |
|
|
|
|
| Manuals and warranty given to owner |
|
|
|
|
| Site cleaned and debris removed |
|
|
|
|
Owner/Representative Name:
Date: