HVAC System Installation Quality Checklist

Project Information
Project Name Date
Location Installer
System Model Serial Number
1. Equipment Inspection
Check Yes No N/A Comments
All components and materials on-site and in good condition
Equipment model and capacity match specifications
Unit installed level and securely anchored
2. Ductwork and Air Distribution
Check Yes No N/A Comments
Ducts properly insulated and sealed
Air registers and returns installed in correct locations
System airflow checked and balanced
3. Refrigerant and Drainage
Check Yes No N/A Comments
Refrigerant lines properly sized and insulated
Leak test completed and passed
Condensate drain installed and tested
4. Electrical and Controls
Check Yes No N/A Comments
Wiring and disconnects installed per code
Thermostat installed and operational
System startup tested successfully
5. Final Inspection and Sign-off
Check Yes No N/A Comments
System operates across all modes
Manuals and warranty given to owner
Site cleaned and debris removed
Installer Name:
Date:
Owner/Representative Name:
Date: