Roofing Installation Quality Control Checklist

Project Information
Project Name
Location
Date
Inspector
Weather Conditions
Checklist
Item Yes No N/A Comments
Material delivered matches specification
Substrate clean, dry, and properly prepared
Underlayment installed correctly
Flashing installed at all penetrations and transitions
Starter strips and edge details installed
Shingles/Panels installed according to pattern and overlap specs
Proper nailing and fastener placement
All joints and seams properly sealed
Valleys finished with appropriate detail
Ridge caps/vents installed securely and correctly
Gutters and downspouts checked and reinstalled if needed
All debris and materials removed from site
Notes/Recommendations
Sign-Off
Inspector Signature Date
Contractor Signature Date