Bulk Carrier Hold Loading Stability Checklist

Vessel & Voyage Details
Vessel Name IMO No.
Port of Loading Date
Cargo Type Cargo Quantity
Checklist
Item Check Remarks
Stability calculations completed as per cargo plan
Maximum allowable loading confirmed for each hold
Trim and draft calculated and within limits
Longitudinal strength checked (bending/shear limits)
Hatch covers secured/checked before and after loading
Ballast water management planned and executed
Cargo distributed evenly in holds as per plan
Freeboard verified after loading
All tank/hold and air vent lids closed
Master notified of loading completion
Additional Notes
Master/Chief Officer Name & Signature
Name: Signature: Date: