| Vessel Name | IMO No. | ||
|---|---|---|---|
| Port of Loading | Date | ||
| Cargo Type | Cargo Quantity |
| Item | Check | Remarks |
|---|---|---|
| Stability calculations completed as per cargo plan | ||
| Maximum allowable loading confirmed for each hold | ||
| Trim and draft calculated and within limits | ||
| Longitudinal strength checked (bending/shear limits) | ||
| Hatch covers secured/checked before and after loading | ||
| Ballast water management planned and executed | ||
| Cargo distributed evenly in holds as per plan | ||
| Freeboard verified after loading | ||
| All tank/hold and air vent lids closed | ||
| Master notified of loading completion |
| Name: | Signature: | Date: |
|---|