Ship/Shore Safety Checklist for Bunker Fuel Transfer

Vessel Name:
IMO No:
Date:
Time:
Location:
Berth/Jetty:
Bunker Supplier/Facility:
A. Pre-Transfer Checks
No. Item Ship Shore Remarks
1 Agreed bunkering plan available and understood
2 Emergency shutdown procedures agreed
3 Communication system tested and agreed
4 All hoses/arms in good condition and securely connected
5 Scuppers/drainage securely plugged where required
6 Suitable drip trays in position under manifolds
7 Bunker lines and valves correctly set
8 Overflow/High-level alarms tested (if fitted)
9 Personnel briefed and aware of duties
10 Personal protective equipment (PPE) available
B. During Transfer
No. Item Ship Shore Remarks
1 Continuous monitoring of transfer operations
2 Communication system working
3 Manifold, pipelines and hoses regularly checked for leaks
4 Scuppers and drip trays regularly checked/emptied
C. Post-Transfer Checks
No. Item Ship Shore Remarks
1 Transfer completed, lines drained and valves closed
2 Hoses/arms disconnected and blanked
3 Bunker samples taken and sealed
4 All areas checked for spillage
Signatures
Ship's Responsible Officer:
Signature:
Shore/Bunker Supplier Representative:
Signature: