Oil Tanker Ship/Shore Transfer Safety Checklist

1. General Information
2. Checklist
No. Item Ship Shore Remarks
1 Communication established and tested
2 Ship securely moored
3 Emergency stop procedures agreed and tested
4 Fire fighting equipment ready
5 Scuppers plugged/Drains closed
6 Booms, hoses, arms properly rigged and in good condition
7 Connection flanges/drip trays in place
8 Safe access between ship and shore
9 Tools, wires, and portable electronic devices controlled
10 Lighting adequate for operations
11 Closed system for loading/discharging in use
12 All doors, ports, ventilation in cargo area properly closed or controlled
13 Persons not involved in operation kept clear
14 Pollution prevention measures in place
15 Procedures for handling spills agreed
3. Additional Comments
4. Signatures