Ballast and Bilge System Pre-Departure Log

Vessel Name:
Date:
Time:
Location:
Chief Engineer:
Voyage No.:
Weather Conditions:
Ballast System Checks
Check Item Status Remarks
Pumps Operational
Valve Operation
Remote Indicators Working
Level Gauges Checked
Pipelines Leak Inspection
Bilge System Checks
Check Item Status Remarks
Bilge Pumps Operational
Valves Free and Operable
Alarms Functioned Test
Bilge Lines Leak Inspection
Additional Notes
Signatures
Chief Engineer:
Date:
Master:
Date: