| Item | Checked | Comments |
|---|---|---|
| Foundation Inspection | ||
| Component Delivery Verification | ||
| Lifting Equipment Prepared | ||
| Weather Conditions Acceptable |
| Step | Completed | Comments |
|---|---|---|
| Tower Erection | ||
| Nacelle Installation | ||
| Blade Attachment | ||
| Electrical Connections |
| Check | Passed | Comments |
|---|---|---|
| Bolt Torque Verified | ||
| Electrical Systems Tested | ||
| Safety Systems Operational | ||
| Site Cleanliness |