Asbestos Abatement Site Inspection Checklist
Date:
Inspector Name:
Project/Site Location:
Abatement Contractor:
Project Number:
Site Conditions
Regulated Area Established
Warning Signs Posted
Waste Disposal Plan Available
Decontamination Area Provided
Engineering Controls in Place
PPE Compliance
Respirators Worn
Protective Clothing in Use
Eye Protection
Gloves
Work Practice Controls
HEPA Vacuums Used
Wet Methods Employed
Negative Air Pressure Established
Proper Waste Labeling
Proper Bagging of Waste
Additional Comments/Findings
Inspector Signature:
Date Signed: