Construction Erosion Control Inspection Checklist
Project Name:
Location:
Date:
Time:
Inspector:
Weather Conditions
Current Weather:
Recent Rainfall (last 24hrs):
Erosion & Sediment Control Measures
| Item |
Condition |
Action Needed / Comments |
| Silt Fences |
|
|
| Inlet Protection |
|
|
| Stabilized Construction Entrance |
|
|
| Stockpile Protection |
|
|
| Soil Stabilization (mulch, seed, matting, etc.) |
|
|
| Perimeter Controls |
|
|
| Runoff Control (diversions, berms, etc.) |
|
|
| Material Storage and Handling |
|
|
| Concrete Washout Area |
|
|
| Other (specify) |
|
|
Corrective Actions Required
Additional Notes
Inspector Signature:
Date: