Fume Hood Inspection and Maintenance Report

Building:
Room Number:
Fume Hood ID/Number:
Inspector Name:
Date:

Inspection Checklist

Item Status Comments
Sash moves smoothly and stays at set point
Glass is intact (no cracks or breaks)
Hood air flow monitor/alarm functioning
Lights are operational
No visible obstructions in airflow path
Interior & exterior surfaces clean
Electrical outlets and switches functional

Face Velocity Reading

Average Velocity (fpm):
Pass/Fail:

Maintenance Actions Taken / Additional Comments

Next Inspection Due:
Inspector Signature: