| Project Name | Date | ||
|---|---|---|---|
| Location | Inspector |
| Check | Item | Comments |
|---|---|---|
| Site perimeter dust control measures in place | ||
| Stockpiles covered or dampened | ||
| Haul roads dampened or stabilized | ||
| Wheel washing system functioning | ||
| Covers on trucks carrying dust-generating materials | ||
| Regular sweeping/cleaning of paved areas | ||
| Spraying during demolition/excavation | ||
| Monitoring equipment operating correctly | ||
| Visible dust levels acceptably low |
| Name | Signature | Date |
|---|