Construction Site Stormwater Inspection Checklist

Item Yes No N/A Comments
Erosion controls (e.g., silt fences, wattles) properly installed and maintained
Sediment controls functioning and intact
Construction entrance stabilized and free of sediment tracking
Material storage areas free of spills and properly maintained
Waste containers covered, labeled, and in good condition
Site perimeter free of offsite sediment discharge
Storm drain inlets protected
Temporary seeding or mulching applied on inactive areas
Visible signs of pollution (oil, chemicals, concrete washout)
Dewatering activities properly managed