| Item | Check | Notes |
|---|---|---|
| Rack frame assembled and secured | ||
| All hardware and fasteners installed | ||
| Rack leveling feet adjusted | ||
| Rack doors/panels installed |
| Item | Check | Notes |
|---|---|---|
| Servers mounted and secure | ||
| Patch panels installed | ||
| Switches installed | ||
| UPS units installed |
| Item | Check | Notes |
|---|---|---|
| Power cables connected | ||
| Network cables routed & secured | ||
| Cable management verified | ||
| Labels applied to cables & equipment |
| Item | Check | Notes |
|---|---|---|
| Equipment powered on/off tested | ||
| Rack environment checked (clearance, accessibility) | ||
| Documentation completed |