Computer Server Rack Assembly Verification Checklist

Rack Frame & Physical Inspection
Item Check Notes
Rack frame assembled and secured
All hardware and fasteners installed
Rack leveling feet adjusted
Rack doors/panels installed
Equipment Installation
Item Check Notes
Servers mounted and secure
Patch panels installed
Switches installed
UPS units installed
Cabling & Power
Item Check Notes
Power cables connected
Network cables routed & secured
Cable management verified
Labels applied to cables & equipment
Final Verification
Item Check Notes
Equipment powered on/off tested
Rack environment checked (clearance, accessibility)
Documentation completed