| Step | Verification | Remarks | checked |
|---|---|---|---|
| 1. Block Cleaning & Preparation | |||
| 2. Crankshaft Installation | |||
| 3. Main Bearing Torque Check | |||
| 4. Piston & Connecting Rod Installation | |||
| 5. Cylinder Head Installation | |||
| 6. Head Bolt Torque Check | |||
| 7. Camshaft/Timing Gear Installation | |||
| 8. Valve Timing Check | |||
| 9. Oil Pump Installation | |||
| 10. Sump Installation | |||
| 11. Rocker Arm/Tappet Adjustment | |||
| 12. Ancillaries Installation (alternator, starter, etc.) |