HVAC System Assembly Verification Checklist

Project Information
Project Name
Location
Date
Inspected By
Assembly Checklist
Item Verified (✔) Comments
Unit identification and labeling
Mechanical fasteners are properly installed and secure
Ductwork connections are airtight and sealed
Electrical wiring is complete and properly terminated
Piping (refrigerant/drain/gas) routing and supports
Insulation is installed where required
All safety guards and covers are fitted
Control wiring and sensors installed / connected
Equipment clearances checked and compliant
Condensate drain connections installed
Filters installed and accessible
Remarks
Inspector Signature

Date