Electronics Manufacturing Line Clearance Checklist

Product Name/Model Batch/Lot No.
Line/Area Date
Checklist
No. Line Clearance Item Yes No Remarks
1 All materials from previous operation/lot removed
2 Work area and equipment cleaned
3 Correct raw components present and labeled
4 Relevant documentation available
5 All tools/equipment are set and calibrated
6 Personal protective equipment (PPE) available
7 Waste bins emptied and cleaned
8 In-process materials from previous batch removed
9 Identification labels/signages correct and up to date
Checked by
Name Signature Date
Verified by (Supervisor/QA)
Name Signature Date