Cosmetic Production Line Clearance Checklist
Product Name:
Batch/Lot Number:
Date:
Line / Area:
No.
Checklist Item
Yes
No
Comments
1
All previous product material removed from line
2
Equipment cleaned and checked
3
Work surfaces and floor area clean
4
Packaging materials removed or replaced
5
Product and documentation for previous batch removed
6
Line clearance signage in place
Additional Comments:
Inspected by:
Signature: