Small Parts Electronics Assembly
Workstation Changeover Checklist
General Preparation
Workstation powered off
Unused parts and tools removed
Surfaces cleaned and cleared
ESD protection in place
Parts & Materials
All required components available
Labels, instructions & documentation ready
Part bins/trays organized
Outdated or wrong materials removed
Tools & Equipment
Tools inspected and functional
Soldering equipment checked
Calibration verified as needed
PPE available
Documentation
Assembly instructions reviewed
Relevant changeover notes read
Quality criteria confirmed
Operator Checklist
Item
OK
Notes
Worksurface Clean
Correct Parts in Place
Tools Calibrated/Ready
ESD Procedures Checked
Sign Off
Operator
Date
Supervisor