Frozen Food Packaging Assembly Changeover Procedure Checklist
Preparation
Review production schedule for next product
Gather required packaging materials
Confirm availability of changeover tools
Ensure line is clear of previous product
Shutdown Current Assembly Line
Stop all conveyors and equipment
Remove remaining product and packaging materials
Clean and sanitize work area
Changeover Setup
Swap or adjust packaging machinery components
Adjust labeling and coding equipment
Set up and load new packaging materials
Replace or adjust guides, rails, and sensors
Quality Checks
Verify material codes and labels
Test run with initial product package
Inspect sample for correct sealing and labeling
Make final equipment adjustments if needed
Restart Line
Reset counters and machine settings
Begin production with new configuration
Monitor start-up for issues