Bakery Production Line Allergen Changeover Checklist

Date:
Shift:
Production Line:
Product (Before):
Product (After):
Allergen Changeover Checklist
Step Completed Initials Comments
All product removed from line and packaging area
Line and equipment surfaces cleaned
Utensils/tools replaced or cleaned
Floor and work areas cleaned
Waste and debris removed
Allergen labels/materials removed or segregated
New product ingredients and packaging verified
Verification
Supervisor Name:
Supervisor Signature:
Date/Time: