Medical Device Assembly Line Changeover Safety Checklist
Pre-Changeover Preparation
| Checklist Item |
Yes |
No |
N/A |
Comments |
| All machinery and equipment are turned off and locked out/tagged out as required. |
| | | |
| Area is clean and free of unnecessary materials/tools. |
| | | |
| PPE is available and being worn by all involved personnel. |
| | | |
During Changeover
| Checklist Item |
Yes |
No |
N/A |
Comments |
| Personnel are following correct changeover procedures. |
| | | |
| Hazardous energy sources are identified and controlled. |
| | | |
| Tools and parts used are accounted for and stored safely. |
| | | |
Post-Changeover
| Checklist Item |
Yes |
No |
N/A |
Comments |
| Guards and safety devices are re-installed and checked. |
| | | |
| All tools, parts, and unused materials are removed from the line. |
| | | |
| The area is clean and ready for operation. |
| | | |
| Lockout/tagout devices are removed as per procedure. |
| | | |