Assembly Line Changeover Checklist
Date:
Time:
Supervisor:
Line #:
Previous Product:
New Product:
Preparation
Production stopped and line cleared
Old materials and ingredients removed
Changeover personnel briefed
Notes:
Cleaning
Equipment cleaned (surfaces, conveyors, etc.)
Work area cleaned and debris removed
Waste disposed properly
Notes:
Inspection
Equipment inspected for cleanliness
Safety guards checked
Defects or issues reported
Notes:
Set-up
New materials/components loaded
Equipment settings adjusted (speed, temperature, etc.)
Coding/Labeling updated
Product samples ready for start-up
Notes:
Verification
Initial samples checked for quality/specs
Documentation updated
Line clearance complete
Line ready for production
Notes: