| Item | Pass | Fail | Comments |
|---|---|---|---|
| Welding procedure approved and available | |||
| Welder qualifications verified | |||
| Base materials inspected and conform to spec | |||
| Welding consumables as per WPS | |||
| Pre-weld joint fit-up and cleaning | |||
| Preheat/interpass temperature monitored | |||
| Weld appearance and dimensions | |||
| Visual inspection for defects | |||
| Post-weld cleaning performed | |||
| NDT methods performed as required |